{"id":9134,"date":"2013-12-10T15:59:46","date_gmt":"2013-12-10T15:59:46","guid":{"rendered":"https:\/\/rsgb.org\/main\/?p=9134"},"modified":"2014-03-24T14:04:00","modified_gmt":"2014-03-24T14:04:00","slug":"ofcom-rsgb-forum-5-december-2013","status":"publish","type":"post","link":"https:\/\/rsgb.org\/main\/blog\/news\/rsgb-notices\/2013\/12\/10\/ofcom-rsgb-forum-5-december-2013\/","title":{"rendered":"Ofcom-RSGB Forum &#8211; 5 December 2013"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-6290\" alt=\"RSGB logo and Ofcom office\" src=\"https:\/\/rsgb.org\/main\/files\/2013\/03\/GB2RS-RSGB-and-Ofcom.gif\" width=\"196\" height=\"131\" \/><strong>A routine quarterly meeting was held between representatives of Ofcom and the RSGB on 5 December 2013.<\/strong><\/p>\n<p>The main issues discussed were as follows:<\/p>\n<p><b>5 MHz NoV<\/b><br \/>\nIt was agreed that there was no need for a paper based application form.\u00a0 It is anticipated that an allocation of 5MHz frequencies will be included in the revised amateur radio terms and conditions in due course.<\/p>\n<p><b>Amateur Radio Licence Review<\/b><br \/>\nThe outcomes agreed within the Litmus Tests were passed to Ofcom.\u00a0 Ofcom confirmed that the timetable for the review envisages that the formal consultation period will last for about 10 weeks and end in the mid-summer of 2014.\u00a0 Agreed changes will be implemented 1 year later.<\/p>\n<p><b>Renewal of Packet, Beacon and Repeater NoVs<\/b><br \/>\nThe renewal procedure will be devised between Ofcom and the RSGB and kept as simple as possible whilst ensuring the appropriate validation of applicants.\u00a0 The process will published on the Ofcom and RSGB websites.<\/p>\n<p><b>Renewal of Permanent Special Event Callsigns<\/b><br \/>\nThe renewal process is in hand by Ofcom.\u00a0 A notice will be published on the Ofcom website (and linked by the RSGB website) to advise NoV holders.<\/p>\n<p><b>Homecoming Scotland<\/b><br \/>\nOfcom advised that licenced amateurs with a main station address in Scotland will be allowed to use the special prefix \u201cA\u201d\u00a0 &#8211; GA, MA,2A \u2013 instead of the usual \u201cM\u201d for the period from Burns Night to St. Andrews Day during 2014.\u00a0 Arrangements for issuing NoVs will be advised via the Ofcom and RSGB websites.<\/p>\n<p><b>Commonwealth Games Glasgow 2014<\/b><br \/>\nMirroring the experience of the London Olympics 2012, applications for special event callsigns for \u201cflagship\u201d stations should be made on an individual basis to Ofcom. Ofcom will advise if any local microwave restrictions are needed to support wireless cameras, etc.<\/p>\n<p><b>Revalidation of Licences<\/b><br \/>\nThe RSGB will work with Ofcom to encourage a phased approach to licence revalidation during the coming months. \u00a0It was reported that currently 47% of all amateur licences still need revalidating.<\/p>\n<p><b>Public Sector Spectrum Release<\/b><br \/>\nIt was reported that plans were on course for a release date of mid-2015 and that changes to the 2.3 &amp; 3.4GHz microwave bands would be enacted via a variation to the Amateur Radio licence.\u00a0 The detail would be communicated via an article in RadCom and on the RSGB website.<\/p>\n<p><b>VHF Spectrum Release<\/b><br \/>\nOfcom confirmed that proposals for consultation would be published by the end of January 2014.<\/p>\n<p><b>Amateur Interference and Abuse of Licence Conditions<\/b><br \/>\nWays of closer working between AROS and Ofcom were discussed including publicising when possible the outcome of investigations and action taken.<\/p>\n<p><b>EMC Interference<\/b><br \/>\nOfcom will be providing an article for publication in RadCom on the work their enforcement section carries out.<\/p>\n<p><b>Building on the success of G100RSGB<\/b><br \/>\nOfcom will consider the principle of issuing a similar special callsign to encourage UK wide activity in future years. <b>\u00a0<\/b><\/p>\n<p><b>Changes to the regulations governing the use of CB Radio<\/b><br \/>\nOfcom will be publishing a statement following the recent consultation, and agreed changes will be enacted in the summer of 2014.<\/p>\n<p><b>Date of next meeting:<\/b> March 2014<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A routine quarterly meeting was held between representatives of Ofcom and the RSGB on 5 December 2013. The main issues discussed were as follows: 5 MHz NoV It was agreed that there was no need for a paper based application form.\u00a0 It is anticipated that an allocation of 5MHz frequencies will be included in the [&hellip;]<\/p>\n","protected":false},"author":41,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[269,55],"tags":[],"class_list":["post-9134","post","type-post","status-publish","format-standard","hentry","category-ofcom-rsgb-forum","category-rsgb-notices"],"_links":{"self":[{"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/posts\/9134","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/users\/41"}],"replies":[{"embeddable":true,"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/comments?post=9134"}],"version-history":[{"count":0,"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/posts\/9134\/revisions"}],"wp:attachment":[{"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/media?parent=9134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/categories?post=9134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rsgb.org\/main\/wp-json\/wp\/v2\/tags?post=9134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}